IRMA projekt sistem d.o.o.
Headquarter: 11080 Beograd-Zemun, Njegoševa 29
Office: 11070 Novi Beograd, Vladimira Popovića 6/210
Tel: +381 11 71-11-472, 71-11-407
Fax: +381 11 71-22-084
e-mail: office@irma-ps.com
http://www.irma-ps.com

Contact Us »

References

EPC, Commissioning, Start-up & Performance Testing of the Ash Handling System under the ESP on A3 Unit

Customer: PE Electric Power Industry of Serbia – TPP Nikola Tesla, Ltd.
Location: Obrenovac, Serbia

Dust Extraction and Collection in Smederevo Steel Mill Facilities with a 45-kW Heavy Duty Industrial Vacuum Cleaner

Customer: Zelezara Smederevo Ltd..
Location: Smederevo, Serbia

Flue Gas Cleaning System and FGD System for the 25 t/h – Industrial Boiler

Customer: Belgrade Paper Factory (FHB) Ltd.
Location: Belgrade, Serbia

Engineering, Delivery, Installation and Commissioning of the Dust Collection System in the Detergent Powder Preparation Plant, Equipped with a 15000 m3/h, Pulse-Jet Baghouse Filter

Customer: SAPONIA JSC.
Location: Osijek, Croatia

Engineering and Delivery of an 8000 m3/h Scrubber for the Cleaning of Exhaust Gases from the Facility for Production and Packaging of Plant Protection Products, Facility 02

Customer: Chemical Agrosava JSC.
Location: Šimanovci, Serbia

Engineering and Delivery of a Dust Collection System in the Raw Material Preparation Plant consisting of two 2750 m3/h Fan-Equipped Silo Bag Filters for Lime and Cement Silos, a 3000m3/h Bag Filter for Bulk Cement Tanker Loading and a 4000 m3/h Bag Filter for Air Slides and Elevator

Customer: LAFARGE BFC Ltd.
Location: Beočin, Serbia

Engineering and Delivery of Batching Hoppers with Air Slides in the Raw Material Preparation Plant

Customer: LAFARGE BFC doo
Location: Beočin, Serbia

Production, Delivery, Commissioning, Start-up & Performance Testing of the Centrifugal Scrubber for Flue Gas Cleaning from Tobacco Drying Process

Customer: Tobacco Factory Rovinj (TDR), Ltd.
Location: Rovinj, Croatia

Production and Installation of Equipment for the New Blow-off Fan in the Rock Mineral Wool Factory

Customer: Rock Mineral Wool Factory Knauff Insulation Ltd.
Location: Surdulica, Serbia

Engineering and Delivery of a Dust Collection System in the Carpet Production Facility, Equipped with a 7200 m3/h Pulse-Jet Baghouse Filter with Anti-Static Filter Bags

Customer: Sintelon RS LTD
Location: Bačka Palanka, Serbia

Design Engineering of the Dedusting System for the Limestone Separation Plant in the Drakuljica Quarry, Municipality of Bileća

Customer: MONTING – ENERGETIKA Ltd.
Location: Trebinje, BiH

Production and Delivery of a Dust Collection Systems Consisting of 6 Pulse-Jet Baghouse filters, each with Capacity of 5000 m3/h, Installed in Soy Protein Concentrate (SPC) Storage Silos in „SOJAPROTEIN“, Becej

Customer: SOJAPROTEIN JSC member of VICTORIA GROUP JSC
Location: Bečej, Serbia

Technical Design of Soy Protein Concentrate (SPC) Pneumatic Conveying & Storage and Silo Dedusting System in „SOJAPROTEIN“, Becej

Customer: SOJAPROTEIN JSC member of VICTORIA GROUP JSC
Location: Bečej, Serbia

Upgrade & Refurbishment of the Dust Collection System for Phosphate Packing Machine

Turnkey Project.

Customer: ELIXIR ZORKA – Mineral Fertilizers Ltd.
Location: Šabac, Serbia

Dust collection System for Phosphate Packing Machine in Prahovo Chemical Industry

Turnkey Project

Customer: ELIXIR ZORKA – Mineral Fertilizers Ltd.
Location: Prahovo, Serbia

Dust Collection System for Rock Phosphate Grinding Plant in Prahovo Chemical Industry

Turnkey Project

Customer: ELIXIR ZORKA – Mineral Fertilizers Ltd.
Location: Prahovo, Serbia

Refurbishment of the Internal Conveying System for Fly Ash Handling from ESP Units for Capacity Upgrade in Gacko TPP

Turnkey Project

Customer: Urals Power Engineering Company, JSC. Yekaterinburg, Russia
Location: Gacko, B&H

Construction & Installation of the Emission Collection System of the Pusher Car at the Coke Plant (Baghouse Capacity: 2×100.000m3/h)

Customer: GOŠA FOM JSC.
Location: USIMINAS S.A. - Ipatinga, Brazil

Dust Collection System for Limestone Processing Plant (Detailed Design)

Customer: DUKAT Ltd.
Location: Palić, Srbija

Rehabilitation and Upgrade of Complete Dedusting System in Coal Preparation and Processing Plant Tamnava (Detailed Design)

Customer: Public Enterprise RB KOLUBARA Ltd.
Location: Tamnava, Serbia

Process and Mechanical Design for Two-Stage System for Wet Flue Gas Treatment in the Boiler Plant no. 4 –Steam Generation 100t/h

Customer: ENERGOLINIJA d.o.o.
Location: Zvornik, Republic of Srpska

Pneumatic Conveying and Dust Collection System for Rockwool Recycling Line; Maximum Capacity 1200 kg/h of recyclate;

Turnkey Project

Customer: KNAUF Insulation Ltd.
Location: Surdulica, Srbija

Venturi Scrubber for Dust Collection at the Parnaby Preparation Plant for Coal Cleaning (Construction)

Customer: RUDING PRINC’S SON Ltd.
Location: Ugljevik, Republic of Srpska

Wagon Tippler Dust Emission Collection System – Coal Dust Injection for Blast Furnace (Baghouse Capacity 150.000 m3/h)

Turnkey Project

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Wood Pellets Production Facility Emission Collection System (Baghouse Capacity 20.000 m3/h)

Turnkey Project

Customer: Gotta Pellets Ltd.
Location: Bajina Bašta, Serbia

Refurbishment & Capacity Upgrade of the Primary Emission Collection System in Steel Mill Hot Metal Desulphurization Station; Baghouse Capacity 210.000 m3/h

Turnkey Project.

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Pig Casting Machine Emission Collection System, (Baghouse Capacity30.000 m3/h)

Turnkey Project

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Upgrade & Refurbishment of the Venturi Scrubber for Sinter Plant Emission Collection, (Capacity 20.000 m3/h)

Turnkey Project

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Emission Collection System in the Lead Battery Recycling Plant (Two Baghouse filters; Q=85.000m3/h; Q=35.000 m3/h)

Turnkey Project

Customer: Trepča Under KTA Administration
Location: Zvečan, Serbia

Lead Battery Plant Emission Collection System, (Construction & Installation)

Customer: Lead Battery Plant Sombor
Location: Sombor, Serbia

Wet Dust Suppression and Dust Collection Systems in the Coal Handling Plant at Kakanj TPP (Detailed Design)

Customer: Public Enterprise El. Industry B&H Kakanj TPP
Location: Kakanj, B&H

Primary Emission Collection System in Steel Mill Hot Metal Desulphurization Station (Baghouse Capacity 182.000 m3/h)

Turnkey Project

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia
Value: 490.000 USD

Sevojno Foundry Emission Collection System (Capacity 59.000 m3/h)

Turnkey Project

Customer: Sevojno Copper Foundry
Location: Sevojno, Serbia
Value: 910.000 USD

Emission Collection System at Coke Pusher and Loading Cars (Baghouse Capacity: 30000 m3/h)

Customer: OAO KOKS, Kemerovo, Russia.
Location: Kemerovo, Russia
Value: 490.000 USD

Flue Gas Cleaning in Dunavka Oil Factory

Turnkey Project

Customer: Dunavka Oil Factory JSC
Location: Veliko Gradište, Serbia

Dust Collection System for Henkel-Merima Detergent Factory

Customer: HENKEL MERIMA Ltd.
Location: Kruševac, Serbia

Refurbishment of the Dust Emission Collection System for VOES ALPINE AHM-104 Tunnel Excavator in Fatnicko Polje Tunnel; (Capacity 40.000m3/h)

Turnkey Project

Customer: EFT Group Ltd. UK, London
Location: Fatničko Polje, B&H

Refurbishment of the Baghouse Facility in the Pesticide Factory (Capacity: 10000 m3/h)

Turnkey Project

Customer: HI Župa JSC.
Location: Kruševac, Serbia

Emission Collection System of Copper Foundry in SIA KMM METALS Ltd. (Detailed Design)

Customer: SIA KMM METALS Ltd.
Location: Riga, Latvia

Dedusting of Copper Slag Secondary and Tertiary Crushing Machines in Bor Mine (Detailed Designs - Mechanical and Electrical Engineering)

Customer: RTB Bor Grupa Ltd.
Location: Bor, Serbia

Dedusting of the Old Crushing Machine in Bor Copper Flotation Plant (Detailed Designs - Mechanical and Electrical Engineering))

Customer: RTB Bor Grupa Ltd.
Location: Bor, Serbia

Two Systems for Gray Cast Iron Furnace Emission Collection in Požega Foundry (Baghouse Capacity 70.000 m3/h and 40.000 m3/h)

Turnkey Project

Customer: KONCERN FARMAKOM M.B. Ltd.
Location: Požega, Serbia

Dust Suppression System in Dumaca Stone Processing Facility with Atomized Water Spraying

Turnkey Project

Customer: INTERKOP Ltd.
Location: Šabac, Serbia

Venturi Scrubber for Emission Collection at the Slurry Treatment Plant in Gacko TPP

Turnkey Project

Customer: Gacko Mine and TPP, JSC
Location: Gacko, B&H

Dust Collection System for Short-Drum Furnaces in the Lead Refinery – (Detailed Design)

Customer: EUKTA Trepča
Location: Zvečan

Special Device for Stator Generator Transfer in HEPP Djerdap 1, EPS Project

Customer: HEPP Djerdap
Location: Kladovo, Serbia

Refurbishment & Replacement of Equipment and Parts for Baghouse Filters Installed in Drmno Coal Crushing Plant

Customer: PRIM Ltd.
Location: Kostolac, Serbia

Refurbishment of Baghouse Facility for Lime & Limestone Grinding Mill

Customer: VICTORIA ZORKA, Mineral Fertilizers Ltd.
Location: Šabac, Serbia

Testing of the System for Measuring Dust Concentrations, Particle Size Composition, Waste Gas and Particulate Matter Emissions at Scrubber Line 4 and I. Fan 4 (Capacity Q=270.000 Nm3/h, 390.000 m3/h)

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Dust Emission Collection System for VOES ALPINE AHM-104 Tunnel Excavator in Fatnicko Polje Tunnel (Capacity 40.000 m3/h)

Turnkey Project

Customer: EFT Group Ltd. UK, London
Location: Fatničko Polje, B&H

Filter Press Refurbishment in Wastewater Facility at U.S. Steel Serbia Steelworks

Customer: US Steel Serbia Ltd.
Location: Smederevo, Serbia

Coal Crushing Plant Dedusting System at the Open-Pit Coal Mine, Baghouse Capacity: 140.000 m3/h (Technical Design)

Customer: Public Enterprise OPM Drmno
Location: Kostolac, Serbia

Relocation of Primary and Secondary Hydrocyclone Stations and Pipeline at the Ash Disposal Site of Drmno TPP

Customer: Public Enterprise OPM Drmno
Location: Kostolac, Serbia

Refurbishment & Upgrade of Flour Storage Silo Baghouse in Food Processing Factory 7JuliDebrc

Customer: FARMAKOM MB Kombinat 7. Juli Ltd.
Location: Debrc, Serbia

Refurbishment of BOF 1, 2 & 3 Venturi Scrubber in SARTID Steelworks

Customer: SARTID
Location: Smederevo, Serbia

Flue Gas Treatment in the Power Plant at Nikšić Steelworks (Detailed Design)

Customer: Nikšić Steelworks
Location: Nikšić, Montenegro

Dedusting System of ELP-3 Arc Furnace in SARTID Foundry (Detailed Design)

Customer: SARTID
Location: Smederevo, Serbia

Dust Collection System for Tailings Conveyance in Veliki Krivelj, Old Bor Mine

Customer: RBN Bor
Location: Bor, Serbia

Refurbishment & Upgrade of Baghouse Dust Collection System at Glinica Alumina Crushing Plant, Capacity Q=50.000 m3/h

Customer: Aluminum Plant Podgorica; KAP
Location: Podgorica, Montenegro

Complete Refitting of the EBS System (Excavator-Belt Conveyor-Stacker) for the Open-Pit Mine Raskovac (Lignite Mine Stanari Detailed Design)

Customer: EFT Group London, UK
Location: Stanari, B&H

Feasibility Study for the Refurbishment of Energetika Power Station in Banja Luka

Customer: EFT Group London, UK
Location: Banja Luka, B&H

Feasibility Study for the Construction of Stanari Thermal Power Plant, with Total Generating Capacity of 400 MW – Coal Conveying and Ash and Slag Handling Systems

Customer: EFT Stanari
Location: Stanari, B&H

Upgrade of Russian-made ESP (Capacity Q=855.000 m3/h) Installed at Blast Furnace Storage Bins in SARTID Steelworks

Customer: SARTID
Location: Smederevo, Serbia

Upgrade of ELEX, Swiss-made ESP Installed at the Sinter Plant in SARTID Steelworks

Customer: SARTID
Location: Smederevo, Serbia

Detailed Civil/Structural Design of the Oil Storage Tank in Bar Seaport

Customer: Jugopetrol
Location: Bar, Montenegro

Detailed Mechanical Design of the Main Nitrogen Pipeline Supplying the Pneumatic Installations of the 1913 SARTID Steelworks

Customer: SARTID
Location: Smederevo, Serbia

Dust Collection Facility for Kakanj TPP Coal Handling System (Detailed Design)

Customer: Kakanj TPP
Location: Kakanj, B&H

Environmental Upgrading of Thermal Power Plants in B&H (EPRS-CS/02 Ash & Slag Handling Systems in Gacko and Ugljevik Thermal Power Plants Reclamation of Ash & Slag Disposal Sites in Gacko TPP)

SUB-CONSULTANCY AGREEMENT with COWI AS, Denmark
Customer: EBRD
Location: Gacko and Ugljevik, B&H

Environmental Upgrading of Thermal Power Stations in Serbia(Ash & Slag Handling Systems in Serbian TPPs)

CONSULTANCY AGREEMENT with WATTENFALL, Europe
Customer: European Agency of Reconstruction (EAR)
Location: TPPs, Serbia